Wednesday Jul 21, 2010

South Generator Farm Progress at Metro

We’re getting great reports still coming in from the construction teams in Atlanta that continue to help us with our Metro facility expansion.

In recent weeks, we have several generator deliveries coming into the facility, which will be placed in our “south” generator farm, providing backup power in the event that main systems experience an outage. Six generators arrived this week, with more scheduled for delivery in the coming days. The six generators on-site are currently being installed and conduit is being roughed in for future start up.  Bollards will be installed around the outside of the generator “farm” to provide protection of the equipment. Eight additional generators will be delivered and installed for the north generator farm throughout July and August – look for additional updates soon.

Progress has also been made on the cooling system. The CRAC (or, computer room air conditioning) units in one of the new pods as well as in the UPS room in the basement have been piped up, and ductwork continues to be installed in those areas as well. The chilled water cooling system in the Metro central plant has been filled and flushed. General construction has also been flowing smoothly progress continues in the computer room areas with raised floor and installation of mechanical and electrical equipment being occurring on the floor, one of the two pods is nearing a “show” condition.

The team at QTS is excited to share the progress of the Metro expansion with all of you. If you have any questions about the facility expansion, please feel free to post them in the comments as we’ll address them as we’re able!

Until next time …

Monday Jun 14, 2010

Advances in electrical and cooling, with excellence in safety

Progress at Metro keeps on rolling; we’re happy to report that our extended team is nearing a record 100 days with an excellent safety record and no accidents on the job. In the past couple of weeks, great steps forward are being made in both the electrical and the cooling systems.[Read More]

Tuesday Jun 08, 2010

Metro expansion making great strides ...

Well, work on our Metro Center expansion has progressed a lot since our last update! We will be working in the coming weeks and months to bring you more frequent updates about the Metro expansion projects as well as other QTS facility expansions or enhancements as they are announced. Over the last two months, the Metro project has really started to take shape. Both pods now look like rooms, with fire and moisture barriers applied and drywall up on all exterior walls.[Read More]

Monday Feb 15, 2010

Metro Project Begins

Over the next several months, QualityTech will be undertaking a significant expansion of our Atlanta Metro facility to provide another 130,000 square feet of finished Data Center Floor Space. Two large raised-floor pods will be added to the facility's existing raised-floor footprint of 200,000 square feet. This expansion will complete 65% of the planned raised-floor capacity of the facility and will provide a total of 330,000 square feet of customer-ready raised floor, making this one of the largest data centers in the nation. As QualityTech continues expanding its data center footprint, it becomes more important to develop innovative solutions in data center design, including the adoption of environmentally sustainable design practices. QualityTech has committed itself to follow philosophies and strategies for LEED certification, as outlined by the US Green Building Council and is planning to obtain LEED certification. The Metro facility's expansion will feature next-generation and green systems, including a Facilities Lab to test new energy conservation initiatives. The lab will focus on air and water economization technologies as well as new developments in power distribution and consumption technology. QualityTech will also deploy advanced cooling and delivery methods to the floor that will allow customers to reach even higher levels of power density. These improvements will be leveraged throughout the facility to improve the services delivered to your environment. It will make the Metro data center our Greenest data center to date.


 

Friday Jan 22, 2010

Atlanta Metro Data Center

Hello and welcome to the inaugural blog entry for project updates from Quality Technology Services.  I am very excited about keeping our customers and partners up to date on the progress of our build out at the Atlanta Metro Data Center.  As many of you are aware QTS was fortunate to have General Atlantic invest $150 million for growth and development of products in the QTS suite.  The initial project is a build out of 130,000 square feet and associated infrastructure.

This blog will be used to show the progress on the build-out as we work on this over the next 6 months.  Check back frequently for updates and check out our cameras that have been placed at strategic points in the facility.  We love the challenge of this project and feel fortunate to have the largest data center in the southeast to expand in!